Cloud Migration & Modernization

Enterprise Cloud Migration to Google Cloud

AI-powered migration planning and execution. Zero downtime. Measurable ROI. 40% faster than traditional approaches.

Our AI-Native Migration Methodology

We don't just migrate infrastructure—we optimize it with AI at every step, delivering 50% cost savings and 40% faster timelines.

1

Assess & Plan (2-3 weeks)

AI-powered infrastructure discovery and intelligent migration planning

AI-Powered Discovery
Automated workload analysis in days, not weeks
TCO Analysis
ML-powered cost modeling and ROI projections
Dependency Mapping
AI identifies application dependencies automatically
Risk Assessment
Predictive models identify migration risks

Time Saved: Traditional discovery takes 4-6 weeks with 6 consultants. We complete it in 2-3 weeks with 3 specialists + AI tools. 60% faster.

2

Migrate & Optimize (6-16 weeks)

Automated migration execution with AI-generated infrastructure as code

IaC Generation
AI writes Terraform, validates, and deploys
Wave Planning
ML optimizes migration sequence and timing
Zero Downtime
Blue-green deployments and automated rollback
Automated Testing
AI-generated test suites and validation

Cost Saved: AI-generated IaC and automated testing saves ~$200K vs manual infrastructure setup. 50% lower cost.

3

Optimize & Innovate (Ongoing)

Continuous AI-powered optimization and cloud-native enhancements

Cost Optimization
24/7 AI monitoring finds savings opportunities
Performance Tuning
ML-based resource right-sizing
Security Hardening
Automated compliance and vulnerability scanning
Cloud-Native Evolution
Progressive containerization and serverless adoption

We Handle All Migration Scenarios

Lift-and-Shift Migration

Quick rehosting to Compute Engine with minimal changes

Timeline:4-8 weeks
Complexity:Low
Best For:Quick wins, time-sensitive
MOST POPULAR

Replatforming

Optimize for GCP while minimizing code changes

Timeline:8-12 weeks
Complexity:Medium
Best For:Balance of speed & modernization

Refactoring/Re-architecting

Full cloud-native transformation (containers, serverless)

Timeline:12-20 weeks
Complexity:High
Best For:Maximum cloud benefits

Database Migration

Move to Cloud SQL, AlloyDB, Spanner, or BigQuery

Timeline:6-12 weeks
Complexity:Medium-High
Best For:Data-intensive workloads

Mainframe Modernization

Legacy system transformation to cloud-native architecture

Timeline:20+ weeks
Complexity:Very High
Best For:Legacy system elimination

Hybrid Cloud

On-premises + GCP integration with Anthos

Timeline:10-16 weeks
Complexity:High
Best For:Regulatory constraints

Enterprise-Grade Migration Features

Zero Downtime Migrations

Blue-green deployments, traffic splitting, and automated rollback ensure business continuity

Data Validation

Automated data integrity checks, reconciliation reports, and compliance validation

Cost Optimization

AI-powered rightsizing, commitment analysis, and continuous FinOps recommendations

Ready to Migrate to Google Cloud?

Get a free migration assessment with AI-powered cost analysis and detailed migration roadmap.